The 6-Step Double Hung Window Replacement Process
Every double hung window replacement follows the same basic sequence, whether it's one cracked sash or a whole-house swap. Knowing the order helps you spot a contractor who's cutting corners versus one running a tight, standard job.
Phone consultation. You describe the problem windows, the home's age, and what's prompting the project — a rotted frame, fogged glass, or storm prep — so the crew knows what to expect before they arrive.
On-site measurement and product selection. A technician measures each rough opening by hand, checks the wall framing and sill condition, and walks you through frame material, glass package, and grid style for your home.
Permit filing. Largo requires a building permit for window replacement, so the paperwork and product approval documentation get submitted to the local building department before any work is scheduled.
Material order and scheduling. Windows are built to the exact openings measured on-site, so installation is set once the custom units arrive rather than off a generic calendar slot.
Removal and installation day. The crew protects floors and furniture, pulls the old sash and frame, sets the new double hung unit plumb and level, shims it, and seals the perimeter against water and air intrusion.
Final walkthrough and cleanup. You test the tilt-in sash operation and locks with the installer, confirm the finish inside and out, and sign off before debris and old units leave the property.
Weather, permit turnaround at the building department, and how many openings are involved all shape how smoothly these steps move from one to the next. A crew that skips the permit step or measures from a brochure spec sheet instead of your actual opening is the kind of shortcut that causes problems at inspection later.